James S.
Yelp
Description Of Work:
Our first interaction was a complete kitchen remodel including all the floors on our first floor and creating a new room out of an extra hallway. This was about 3 months long. The most recent interaction was converting a room into an office. This was just over a week, plus time to wrap up.
Up front details about B&K
They do NOT allow any employees or sub-contractors smoke on premises, very nice!
They were nearly always early, very punctual.
We had such good luck with our first project we used them again.
Both designers we worked with did a great job.
When there are issues with any work they did, they come back out and fix it. If it is an emergency, they take care of it.
They don't do the painting. But they recommended someone to do that, and that guy was awesome too.
Project 1
During the kitchen remodel there were issues that popped up with at least 5-10 different things, but the supervisor from B&K always got everything resolved. Any large project will have issues but how those issues are handled are what make the difference between mediocre and great service.
This project consisted of a slew of electrical work, ripping out and entire existing kitchen and flooring in 4 rooms, putting up walls where an extra hallway existed. Creating a new laundry room, new mudroom, new wood flooring, new appliances and a new staircase, uncarpeted to match the new wood floors.
I want to focus on the new cabinets we put in the kitchen. The person they had working on installing the cabinets was meticulous. At first I was a little taken aback by the lack of progress with the cabinets getting installed, but after some substantial portions getting knocked out, my concerns were completely and utterly erased. I have never seen someone install cabinets so well and so perfect. I mean, PERFECT! This dude not only knew what he was doing, but at one point, he was explaining to my wife and I that it had been taking him a little longer than normal because of a couple locations for how they came together and he wanted to make sure there were exact or else we, and everyone would notice. He was so right.
One major issue we had was with our new range. The stove top wasn't working. Clearly not a fault of B&K, but they got the manufacturer to get it fixed in a timely manner instead of me having to deal with it. As a matter of fact, I think our supervisor was more upset about the issue and resolution process with the manufacturer than I was.
There was an issue having an improperly sized cabinet ordered and they took care of it swiftly. When the new counter tops came in with the wrong nosing, they solved it and rectified the issue.
All in all, it took probably about 3 weeks extra time to completely wrap up the project because of the combined time delay from the issues. Again, to reiterate, how mistakes are handled is really the name of the game. No home project will ever go perfect. Having B&K do this project was excellent.
About 1 year after this project was complete we had some grout cracking between the counter top and the tile on the wall, they came out, ripped out the old grout and regrouted.
Project 2
The office project was fast. Demolition took just about a day. Electrical took about a day. The new flooring took less than a day. and the cabinets and desk got installed in about 2-3 days. After that the office was trimmed. The cabinet company shipped a door that was the wrong style, so we had to wait for a new door to show up, but in about 1 week the project was 90% done. The last 10% took about a month to finish, but mostly due to my own schedule and availability to be home to show what needed to be taken care and to let them in. The office was completely useable by the end of the 2nd week.