3
"Built at a cost of US$1.4 billion, this new stadium was designed with accessibility and connectivity in mind: 500 seating spaces are reserved for wheelchair users, toilet-seat heights have been raised by one centimetre to help those with mobility difficulties, and 1,300 Wi‑Fi hotspots can accommodate up to 30,000 simultaneous connections so spectators can post and livestream events. The venue is part of wider Olympic preparations — the host city had already spent US$9.7 billion on 340 related projects as of December 2019." - Delle Chan
Iconic Olympic venue with modern design and accessible seating
10-1 Kasumigaokamachi, Shinjuku City, Tokyo 160-0013, Japan Get directions